Your practice plan & dress rehearsal
Order, event week and rehearsal

Your practice plan & dress rehearsal

Skill in floristry is almost entirely repetition. A professional has built a thousand compotes; you need to have built about fifteen before the ones that count. This chapter is a month-by-month calendar generated from today and your event date, with one session a month and a dress rehearsal at the end.

Start here Essentials

This chapter asks for a session a month, a dress rehearsal and a full build. Everything marked Go deeper is optional.

  1. Set your event date in setup. The calendar below is generated from today and your date. See setup.
  2. Book one session a month with real stems. Two to three hours each. Start every session with the processing drill. See Principles.
  3. Follow the calendar sessions for the pieces on your list. Each row names the chapters to reread and the build to repeat. See The calendar.
  4. Do a timed dress rehearsal. Run the pieces you are making as a full production line, time everything, and fix the run sheet. Buy a test bunch from your supplier first. See The test bunch and The dress rehearsal.
  5. Do the full build and record the numbers. Build it from the real recipe, photograph it, and write down heads per vessel, stems per vase and minutes per piece. See The full build.

Minimum time: Two to three hours for the first session. Done when: your first monthly session is booked and the processing drill is done once.

1. Principles Understand

Every other chapter ends with a practice exercise. This one turns those exercises into a schedule, then ends with two rehearsals: a test bunch that checks your flowers and your house, and a timed dress rehearsal that checks your plan and your helpers. The full build is the last practice build before flower week.

  • One session a month minimum, two to three hours, with real stems. Grocery flowers in winter; the garden in season.Preference
  • Every session includes the processing drill. Conditioning becomes automatic only through repetition.
  • Photograph everything from a seated eye line and from above, in the light it will be seen in. Keep a dated folder. In the final month you will look back and see how far you have come, and you will see which pieces to stop improving.
  • Time every build. Your times, not a tutorial's, set the production schedule. A Practical Wedding suggests practicing a centerpiece up to ten times.Test it
  • Practice the real vessels, the real mechanics, the real candles. Not a jam jar.

2. The calendar

Minimum: one session a month, starting with the processing drill; a timed dress rehearsal; and a full build from your real recipe, photographed, with the numbers written down.

The calendar skips the pieces you are not making. With under six months, sessions are merged; keep the conditioning drill, the mechanics and the dress rehearsal, and drop the repetition months first.

3. The test bunch

A test bunch is a small order from the same source as your real order, bought two to four weeks before the event and handled exactly as you will handle the real flowers. It is the only way to learn how your supplier's flowers arrive and how long they last in your house in that season. Prepping & conditioning flowers and Personal flowers: bouquets, bouts, corsages send you here.

  1. Order a small quantity of each flower you are least sure about from the supplier you will use, for delivery on the same weekday as the real order. A bunch of each is enough.
  2. Process it on arrival exactly as Prepping & conditioning flowers describes, and hold it where you will hold the real flowers.
  3. Write down how it arrived: stems per bunch, how many were broken or soft, how open the heads were, and how long the box sat before you opened it.
  4. Watch it open. Photograph each flower once a day. Note the day each one looks the way you want it at the event, and the day it starts to fade.
  5. Run the six-hour test (Personal flowers: bouquets, bouts, corsages) on anything that will spend the day out of water.
  6. Change the plan if the bunch says so: move a delivery a day earlier or later, swap a flower, or change where it is held. Record each flower on the test bunch sheet.
What you recordWhyWhere it changes the plan
Stems per bunch, as deliveredBunch sizes vary by seller and flowerThe order in Recipes, quantities, sourcing & ordering
Losses on arrivalSets the buffer for that flowerThe order in Recipes, quantities, sourcing & ordering
Days to openSets the delivery dayThe flower-week table in Production: timeline, helpers, transport, setup
Days at their bestSets the build day for each pieceThe run sheet in Production: timeline, helpers, transport, setup
Hours out of water before wiltingSets which flowers go in personal flowersRecipes in Personal flowers: bouquets, bouts, corsages
Holding temperature, afternoon and early morningConfirms the cool room in that seasonCold storage in Prepping & conditioning flowers

4. The dress rehearsal

The dress rehearsal is a timed build of a slice of the event, with your helpers, run from your draft run sheet. Its job is to find what the plan gets wrong while there is still time to fix it. Hold it three to six weeks before the event, so there is time for a second rehearsal if the first goes badly.Preference

  1. Build one of each piece type you are making, and three of the piece you are making most of, as a production line (Centerpieces, bud vases & tablescapes) with the helpers who will be there on the day. Use the real vessels, mechanics, recipes and station cards.
  2. Time every step: setup of the stations, each piece, crating, loading and cleanup. A phone stopwatch and one person writing the times down is enough.
  3. Crate, load and drive the pieces as you will on the day: the real vehicle, the real crates, water an inch below the rim, a drive of the same length or round the block.
  4. Place them on a table set the way the venue's will be, from the photo map, and sit at it.
  5. Fix the run sheet the same evening: multiply the times up to the real piece counts, add the setup and cleanup times you measured, and move anything that no longer fits.
Limits

A rehearsal at home measures your hands, your helpers, your vehicle and your house. It does not tell you how the venue's heat, wind, light or access will behave on the day, and it does not tell you how the flowers you buy for the event will arrive. The site visit settles the venue: go at the same hour, and in an outdoor setting take one finished piece. The test bunch settles the flowers. If the rehearsal shows the plan does not fit, cutting a piece type is a sound answer; fewer pieces done well beat more pieces done in a rush.

5. The full build

Professional programs end with a showcase and a critique. Yours is the full build in the last month before the event. Treat it as a showcase:

  1. Build one full table (or an 8-foot section) from the real recipe, with the real vessels, candles and place settings, in the light the event will be seen in.
  2. Invite a critic (Go deeper; optional): a florist, a friend with an eye, or the hosts. Ask three questions: what would you remove, what is the weakest piece, what would you not change.
  3. Photograph it properly, seated eye line, standing, above, and by candlelight. These photos are the setup crew's map.
  4. Record the numbers: heads per bowl, stems per vase, minutes per piece, buckets used. These overwrite every estimate on this site.
  5. Write the one-page lessons note (Go deeper; optional) and read it at the start of flower week.

If you are making only personal flowers, the full build is the bouquet and every boutonniere and corsage, built in the order and at the times on your run sheet, then left out of water for six hours.

6. A second rehearsal for large pieces Go deeper

Large pieces (urns, arches, aisle clusters, installations) fail in ways a tabletop rehearsal does not show: weight, wind, lifting and time on site. If you are making any, rehearse one again, on its own, after the main rehearsal.

  • Build it on its real base with its real weight, then lift and carry it the way the movers will, by the bowl or insert. If two people cannot carry it comfortably, split it or lighten it.
  • Take it outside for four hours in the conditions you expect (Ceremony, urns, aisle & large-scale), with a fan if the day is calm.
  • Time the on-site work: greenery, then flowers, then hiding the mechanics. For an arch, the on-site time is usually the longest single task of the day, so it sets when your setup crew starts.
  • Rehearse the move if the piece changes places between ceremony and reception: from where, to where, carried by whom, topped up by whom.

7. Briefing your helpers Go deeper

The dress rehearsal is also the helpers' training. Brief them the same way you will on the day, and they will know the routine by flower week.

  • One page per helper: their tasks from the run sheet, the times, where they need to be, and who to ask if something goes wrong.
  • The sample piece and its photo in front of anyone who builds, with the station card showing the counts.
  • One rule per station, said out loud: "foliage over the rim first", "airy stems in two directions only", "lift by the bowl".
  • The day-of contact: one person, not you, who has the map, the watering can and the spare stems, and whom the venue can call.
  • Ask what was unclear at the end of the rehearsal and fix the page that night.

8. See it See it

Fictional example

Simone and Emmett's dress rehearsal. Barn wedding on Saturday 21 August 2027; 15 compotes, 3 station pieces, 3 attendant bouquets and 4 boutonnieres. On Wednesday 28 July a test bunch arrived from the wholesaler (one bunch each of lisianthus, eucalyptus and olive), the same weekday as the real delivery. The rehearsal was on Saturday 31 July, the day Simone counted the aunt's hydrangea, with her two friends and her aunt, in the farmhouse kitchen.

StepPlannedMeasuredChange to the run sheet
Set up three stationsNot on the sheet35 minStations set up Thursday evening
3 compotes on the production line48 min (16 each)51 min15 compotes: about 4 hr 15 min; the Friday line now runs 9 a.m. to 1:30 p.m.
1 station piece30 min40 minStation pieces move to Thursday afternoon, already there
1 attendant bouquet30 min25 minNo change
2 boutonnieres30 min35 minNo change
Crate, cart, carry 200 yards to the barn15 min a trip20 min; one compote slopped water over its rimWater an inch lower, towels between compotes, cart pulled slowly on the gravel
Clean upNot on the sheet40 minFriday ends at 5 p.m., not 4

Test bunch: lisianthus arrived 10 stems to a bunch with one broken stem, tight, and was at its best on day 3 (Saturday) and still good on day 6. Eucalyptus came as 8 stems, not 10, so the eucalyptus line on the order went up by two bunches. Known: the times above, with these helpers. Assumed: the aunt's heads will build like grocery heads; that is still untested until the test cut on 7 August (Prepping & conditioning flowers). Open: the barn at 3 p.m. in August (settled by Thursday's forecast and the doors). The full build, one full table with the aunt's heads and the real candles, is booked for Saturday 7 August, after the test cut.

Free guide. Checked live on the date in the resource library.

9. Practice: run the dress rehearsal Practice

Minimum: a timed build of one of each piece you are making, crated and carried, with the times written on your run sheet. The second rehearsal for large pieces and the helper briefing are Go deeper. Time: half a day, three to six weeks before the event. Materials: the real vessels and mechanics, flowers for the pieces you are building (a test bunch, grocery or garden), your recipes and station cards, your draft run sheet, the vehicle and crates, a stopwatch, and a helper to write down times.

  1. Set up the stations and time it.
  2. Build one of each piece type, and three of your most numerous piece as a production line, and time each.
  3. Crate, load, drive and place them as on the day, and time it.
  4. Clean up and time it.
  5. Fix the run sheet the same evening: multiply up, add setup and cleanup, and move what no longer fits.
  6. Write down what you keep. The planned and measured times and the run sheet changes, on the dress rehearsal sheet, which starts with one row per step for the pieces you make; and the test bunch on the test bunch sheet. Then correct the flower-week run sheet. All three print with your binder.

10. Your event Your event

11. Check your work Check your work

Criteria

  • Did the rehearsal include every piece type you are making, built by the people who will build it?
  • Is every step on the run sheet now a measured time, not a guess?
  • Multiplied up to the real counts, does the build still finish on the day it is planned for, with cleanup?
  • Did the pieces survive the carry and the drive without spilling or shifting?
  • Did the test bunch arrive as you expected, and did you change the order or delivery day where it did not?
  • Is your own last task on the day still hours before the start?
  • Is the full build booked, with the real flowers if they are in season?

Worked example

Fictional example: Simone's rehearsal, checked against the criteria. Piece types: all four, built by the people on the run sheet. Times: measured, including setup and cleanup, which were missing before. Multiplied up: the Friday line now ends at 1:30 and the day at 5 p.m., which still leaves the evening for boutonnieres. Carry: one spill, fixed by lower water and towels. Test bunch: eucalyptus came 8 to a bunch, and the order changed. Her last task: still 11 a.m. Full build: booked for 7 August. What is left: the barn's heat and the aunt's heads.

Common mistakes

  • Rehearsing alone. You notice it when the helpers ask on the day what goes where. Rehearse with them.
  • Timing only the building. You notice setup, crating and cleanup eating the afternoon. Time those too.
  • Rehearsing too late. You notice there is no time to act on what you found. Hold it three to six weeks out.
  • Skipping the carry. You notice water on the van floor on the day. Carry and drive the rehearsal pieces.
  • A test bunch from a different source. You notice the real order arriving differently. Buy the test bunch from the supplier you will use.

What is still unresolved

The rehearsals settle your hands, your helpers and your flowers. They do not settle the venue on the day or the weather. The site visit, at the event hour, settles light and access; the forecast in flower week settles heat, wind and rain; and the venue's written rules settle what you may do. Everything else should now be a measured number on your run sheet.

12. Knowledge check and scenario

Why does the test bunch come from the same supplier as the real order?
What it tests is how that supplier's flowers arrive (stems per bunch, losses, how open) and how long they take to open in your house. A bunch from a different source answers a different question.
Why is the dress rehearsal three to six weeks before the event and not the week before?
It exists to find problems, and some fixes take weeks: a new vessel, a changed delivery day, another helper, a second rehearsal. The week before, the only fix left is to work harder on the day.
Your rehearsal compotes took twice as long as planned. What are your options?
Move the build earlier or over two days, add a helper to the production line, simplify the recipe and rebuild it, or make fewer pieces. Recheck the run sheet with the new time; do not keep the old plan and hope to be faster on the day.
What does the full build record that a photo alone does not?
The numbers: heads per vessel, stems per vase, minutes per piece and buckets used. They replace this manual's estimates in your order and your run sheet.
Fictional example: Ines is making only her bouquet, three boutonnieres and a corsage for an 11 a.m. city hall wedding on 20 March 2027. Her flowers arrive Wednesday 17 March. What does her dress rehearsal look like?
Practicing each piece is not the same as running them in order on a timetable. The rehearsal finds out whether Friday evening is long enough and whether the boutonnieres hold from 9:45 a.m. to the end of lunch.
This runs her real flower week on a smaller scale, at the real times. She learns how long Friday evening takes and whether everything holds through a six-hour day out of water. If she can get ranunculus that week, it doubles as her test bunch.
A spare bouquet is a good idea for the day itself, but as a rehearsal it comes too late to change anything.

Checklist

Records your learning only; it is not a qualification.

Have you just done what this manual teaches? If it is still fresh, we would like to hear about it. We are looking for volunteer guides to add a few short passages from their own experience to this manual. Write to guides@learnthings.online for the details.